Monday, 22 November 2010
Monday, 15 November 2010
Scuttle, Fiewall & Dash Moumting
Monday, 8 November 2010
Side panel (drivers side)
Side panel finally installed, the panel had been trial fitted and drilled back in April but had been awaiting the hydraulic brake hoses to be installed. The panel was final fixed using glued and riveted.
Goodridge Brake Hoses
Tuesday, 13 April 2010
Fitting the Side Panel - Passenger side
After connecting up the speedo and gearbox sensors I fitted the tunnel wall. Lets hope there are np more requirements for access as space is severly restricted.
If I do require access I will probably cut hatches.
Fitting the side panels was the longest task to date due to my choice to rivet every 50mm. The drivers side is ready to be fitted but the running of the front brake lines will be easier without the panel fitted.
If I do require access I will probably cut hatches.
Fitting the side panels was the longest task to date due to my choice to rivet every 50mm. The drivers side is ready to be fitted but the running of the front brake lines will be easier without the panel fitted.
Thursday, 18 March 2010
Speed Sensor & Magnets
Fuel System
Thursday, 28 January 2010
Mounted the Jenveys
Mounted the Jenveys. The wiring harness from the original inlet manifold to be utilised for the new installion.
Location of the fuel system (swirl pot, fuel pump and regulator) components is delaying progress. I am planning on using the Goodridge braided hoses and fittings which will require a different fuel pump and the fuel rail fittings.
Location of the fuel system (swirl pot, fuel pump and regulator) components is delaying progress. I am planning on using the Goodridge braided hoses and fittings which will require a different fuel pump and the fuel rail fittings.
Subscribe to:
Posts (Atom)