GBS Zero - Phil Howard
Search This Blog
Followers
Blog Archive
►
2011
(2)
►
June
(1)
►
January
(1)
►
2010
(10)
►
November
(4)
►
April
(1)
►
March
(4)
►
January
(1)
▼
2009
(28)
►
December
(5)
►
November
(3)
►
October
(4)
►
September
(2)
►
August
(1)
►
July
(3)
▼
May
(8)
Brake and Clutch Pedals
Refurbished Parts
Replacing the Lock Barrel on the Ignition Switch -...
Replacing the Lock Barrel on the Ignition Switch -...
The kit unloaded...........now what?
With the kit loaded and the paper work completed, ...
Loading the kit and checking through the inventory.
GBS Factory Gate 9th May 2009
►
April
(2)
About Me
phil howard
View my complete profile
Friday, 29 May 2009
Refurbished Parts
After much cleaning, wire brushing and painting the Differential, Gearbox, Half shafts and Steering Column are finally looking good enough to be installed.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: only a member of this blog may post a comment.